Glossary

The Standard Speed Climbing Route

Why the fixed Speed route makes repeated practice, records and cross-event comparison possible.

Updated October 26, 2026

Definition

The speed route is the standardized set of hold positions used for official speed climbing.

What stays fixed

Hold type and coordinates are prescribed for certified international walls. That is why athletes can train the same problem year-round and why records can be compared.

What still varies

Beta, skipped holds, and whether a gym wall is certified for records.

The route in numbers

The IFSC Speed Licence Rules publish the official 15 m route as a route plan. Each lane has 20 hand holds (listed as “big holds”) and 11 foot holds, plus a stop device at the top. Every hold has a panel, grid position and orientation. The panels are 1.5 m squares with a standard grid of bolt holes, so the same plan can be reproduced on any recognised wall.

The World Climbing Event Regulations require individual speed events to be held on walls built to that specification, with parallel lanes.

Example

Because the plan is fixed, an athlete can rehearse the first three hand holds in a home gym on a certified wall and meet exactly the same positions at a World Climbing Series event.

See also: route map, speed wall layout, beta.

Sources: IFSC Speed Licence Rules – Speed Walls (dated 01/02/2022) §1.1.3, §1.1.6 and §1.2.4; World Climbing Event Regulations, version 3, January 2026 Annex B §1.1. Last checked October 26, 2026.

Related guides

See the standardized route and hold layout.